img

About Instructor

About alex ditiatkovsky

Analysis of boiler performance with FTR Portable system Step 1: Removing of thermal insulation and Preparation of the opening for FTR sensor in 3-4 chosen locations on the furnace wall Step 2: Attachment of installation channels in those locations (the channels will be fabricated by AMS according to actual dimensions of the water wall tubes) Step 3: Closing of thermal insulation around the installation channels Step4: Performance of measurements of Fouling Thickness and Reflectivity using Portable FTR system (FTR sensor will be replaced between all chosen locations).

Skills
  • No skills to show
Certifications
  • No certificate to show
Awards
  • No award to show
img
alex ditiatkovsky

CEO

1 Years of Membership Author Level 1 0 to 5 Course 0 to 10 Student 0 to 10 Sold
0
Followers
0
Following
  • Author Level 1 (Ranking)
  • 1 Courses
  • 15 Video Lectures
  • 1 Students
  • 0 Quizzes
  • 0 Assignments
  • 3 Meetings
  • 1 Reviews (3.0 average)
  • kurfurstenstra