CLINKER FORMATION FOULING
Step 1: Removing of thermal insulation and Preparation of the opening for FTR sensor in 3-4 chosen locations on the furnace wall
Step 2: Attachment of installation channels in those locations (the channels will be fabricated by AMS according to actual dimensions of the water wall tubes)
Step 3: Closing of thermal insulation around the installation channels
Step4: Performance of measurements of Fouling Thickness and Reflectivity using Portable FTR system (FTR sensor will be replaced between all chosen locations).
1 Reviews
11 months ago
Give sone better system
Analysis of boiler performance with FTR Portable system Step 1: Removing of thermal insulation and Preparation of the opening for FTR sensor in 3-4 chosen locations on the furnace wall Step 2: Attachment of installation channels in those locations (the channels will be fabricated by AMS according to actual dimensions of the water wall tubes) Step 3: Closing of thermal insulation around the installation channels Step4: Performance of measurements of Fouling Thickness and Reflectivity using Portable FTR system (FTR sensor will be replaced between all chosen locations).